To install and fix plasterboard to internal farming. If possible include the plaster finish also. Stud height is a mix of 2.7 and 2.4 in bedrooms and bathroom areas. Windows are reveled. Internal doors to be architraves to be done by others Works to start 5th of August. Please contact me for a site visit and a take off for the plasterboard and the cost to do the works. Plaster board supplied by others.
#1 | Tradie 1 |
|
4 jobs | No longer in contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
38 jobs | No longer in contact |
#4 | Tradie 4 |
|
27 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work