1950s Brick House Prepare fridge cabinet area for plasterboard lining. (Small amount of framing) Remove old food safe "window" and rebrick outside hole. Install customer supplied insulation on inside of exterior walls (wall linings have already been removed). Approximately 19 sqm. Framing to be prepared for the installation of GIB plasterboard below. Fit and install 24 sheets of customer supplied GIB Aqualine in kitchen, laundry and bathroom walls & ceiling. Approximately 76 sqm less window and door & window cut-outs of 13 sqm = 63sqm. To be ideally started on Friday ( --- ).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 30-06-2020
Tradesperson reply
"Thanks George great to work for you, all the best with the renovation"
#1 | Tradie 1 | No recent reviews | 42 jobs | Secured job |
#2 | Tradie 2 |
|
63 jobs | No longer in contact |
#3 | Tradie 3 |
|
20 jobs | No longer in contact |
#4 | Tradie 4 |
|
255 jobs | No longer in contact |
#5 | Tradie 5 |
|
211 jobs | No longer in contact |
#6 | Tradie 6 |
|
376 jobs | No longer in contact |
#7 | Tradie 7 |
|
22 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 66 jobs | No longer in contact |
Partner with Builderscrack
Get work