Review

ceiling install

Job description

Plasterboard Installation
Christchurch

I require the a gib ceiling to be installed , is well prepared and already battened off ,note - it is a fire rated ceiling and must be correctly installed , 16mm fireline required , aprox working height of 2.2m . aprox 150sqm , timeframe aprox early sept. major materials supplied ,


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
4.0

Work carried out by the owner/operator
Reviewed on 26-11-2019

Verified Builderscrack review