Published: 11 June 2024
Need a metal driveway put in from top of hill to the bottom, nothing flash, just something that will do the job, bit of smoothing may be needed, driveway is on the right hand side going down hill needs Gap 40-65 . The biggest problem would be getting to driveway as road is pretty bad once the rain sets in and need a couple fine days to dry this out, would be best to come and have a look and see what can be done, even if it’s just to dump metal down.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work