Require construction of concrete pathways around a building
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
The paths came out great. A little disappointed in some of the touch up work. Soil edging on one path smoothed down but on the other it was left untidy. same with lawn damage from Concrete truck. 4 divots left unrepaired.
Work carried out by an employee of the company
Reviewed on 08-04-2024
Tradesperson reply
"Oh heck, sorry touch up work is not 100% - I will come and take a look this afternoon, and see what we can do there.