Published on 18 March 2024
1. Demolish and remove back door slab that has been heaved up (2.5x1.2x.100) 2. Lay two slabs a. 1.2m x 1.0m x 400 thick - by back door b. 1.2m x 2.2m x 400 thick - under a/c unit (which will be removed) 3. Lay short adjoining mow strip 190x 190x 3.2m long
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great coms and quick work - 3 days from awarding job to completion.
Work carried out by the owner/operator
Reviewed on 29 March 2024