Published on 23 September 2023
Existing concreting is starting to break and my DIY solution (in the photos) is no longer viable. There is a water meter below the big square wood block (shown in photo) which needs to remain accessible and the rest concreted. I would like the concreting to be done around the water meter and possibly later put a slab of hard tile/concrete on top which could be removed if needed. Any other ideas are welcome. Car is parked over this area at all times. Area is roughly 900mm by 1800mm.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Absolutely amazing workmanship. Prompt communication and super quick completion. All as discussed and promised. Delivered with excellence. Will use again for all future related work.
Work carried out by the owner/operator
Reviewed on 29 September 2023
Tradesperson reply
"Thank you so much for your feedback, I really appreciated 💯%"
Partner with Builderscrack
Get work