Posted 1 month ago
Asphalt to be made good at Waterloo Street Frankton
Asphalt
Frankton, Hamilton
Around 46 m2 of area in total, 11 meters down the alleyway Waterloo Street, Frankton, including in front of the roller door of number 3, where underground plumbing work was carried out. Remove old asphalt, repair and prepare the base, and seal.