Published: 12 February 2024
My backyard has a paved area. Over time part of it has sunk down so it is uneven. This is T C1 land and very stable, so I don't think there's a big problem, but I'm thinking of selling soon so I would like to get an area..approx 2m x 3m, lifted up and repaid so it is all level.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Job was completed on time to a high standard, which made up for the cost being a little on the high side.
Work carried out by the owner/operator
Reviewed on 08-03-2024
Partner with Builderscrack
Get work