Published on 3 July 2024
Over the years, the entrance point to the warehouse concrete driveway has deteterioated. It has started to crack and falling apart. The width of entracnce is approx 4.0m
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Norm communicated well throughout the process, provided detail drawing for the work, and managed to get the jod done very quickly over the wet winter condition and he and his team finished the job to a very high standard.
Work carried out by the owner/operator
Reviewed on 9 August 2024
Tradesperson reply
"Thank you Sir.
Regards Norm"
Partner with Builderscrack
Get work