Published on 29 April 2024
Lay new straight-line border of cobles in concrete bed at this point to give border. All cobles removed from site and dispose at clean fill site. Set depth of drive base to 150mm and compact.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work, we are happy with the results. Will load some more pictures.