Published: 11 January 2024
I have a brick drive on a slope laid many years ago. The bottom 3 mts (entry end) has sunk due to lots of rain and some heavy vehicles on it. I am looking at options, including to have the bottom 4 metres re-leveled and replaced with concrete, possibly colour matched and am looking at prices to do this. I will remove the existing bricks.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I wouldn’t hesitate to recommend Asi’s services. He found solutions for the site challenges that kept the job affordable and the job was done quickly & efficiently with good communication. Both he and his helper were a pleasure to deal with. Thank you Asi
Work carried out by the owner/operator
Reviewed on 29-01-2024