Published: 10 November 2024
We want to level the ground space of 6m x 5m. To the left of the carport. There's a non descript garden we want to gravel over. Open the existing driveway off to the left so we can drive car and bikes up to extra parking space. Slight gradient on land. Could level out with retainer wall. Lay gravel. Later put pergola over part of it.
Workmanship |
4.0
|
Cost |
1.0
|
Schedule |
1.0
|
Communications |
1.0
|
The concrete was completed by a subcontractor. Good job. High cost. The quote for carport was not transparent. Therefore we couldn't continue with the project due to discrepancies. Communication was difficult. He did try but we just kept falling short when it came to quote transparency. I had to repost job and it went from MBM quote of 10k to other quotes reci bed in a day at 5k, was even one at 3.5k. I feel lucky I was in a position to change workmen .
Work carried out by a subcontractor
Reviewed on 21-12-2024
Partner with Builderscrack
Get work