Published: 29 August 2024
We need to rwlay our driveway with a permeable gravel system with a fall away from our garage. Scope is as follows and outlined in drawings attached (photo with bricks is current, the other one the proposed/desired layout): > Excavate driveway to 150mm below levels indicated on proposed plan, forming a fall away from the garage and towards the side lawn. > Estimated raw soil to be removed is 6.5m3 > Install base course and compact as per surepave requirements. Strol Surepave > Construct low height retaining wall against fence & install retaining boards below deck. > Install new channel drain > Install permeable paving mats and fill with client selected gravel/pebble mix > Replace 3 timber steps on decking > Repair or replace a deck pile that is not connected to the deck as shown in attached photo. Happy to hear any recommendations for alternative products or solutions to ensure water drains away from the garage. We will uplift the bricks ourselves and would be looking to start the work on the 9th of September (weather dependent).
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 |
|
113 jobs | No longer in contact |
#4 | Tradie 4 |
|
64 jobs | No longer in contact |
#5 | Tradie 5 |
|
38 jobs | No longer in contact |
#6 | Tradie 6 |
|
282 jobs | No longer in contact |
#7 | Tradie 7 |
|
1 job | No longer in contact |
#8 | Tradie 8 |
|
164 jobs | No longer in contact |
Partner with Builderscrack
Get work