The top floor and entrance of our house needs a refresh with plastering and painting. The walls are very uneven at the moment and the paint job was done in a bit of a hurry. We would like it done to a higher standard. All work will need to be completed before the 7th of October 2023. Area includes x2 small bathrooms, x3 bedrooms, small hallway & entrance/stair case. Roughly 55sqm
#1 | Tradie 1 |
|
4 jobs | No longer in contact |
#2 | Tradie 2 |
|
21 jobs | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work