I would like to repait my bathroom as it has developed bubbles an cracks in the existing paint work. The gib board has mo ben taped and so the paint has developed cracks. It is a cathedral ceiling house and so the walls and ceiling in the bathroom are very high. I have the paint already.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Reviewed on 23-12-2019
Tradesperson reply
"Thank you"
Partner with Builderscrack
Get work