3 sections of exterior need another coat of water based stain. I don't think any preparation is required. Home built 2020.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Good clean job. Recommend Ian without reservation.
Work carried out by the owner/operator
Reviewed on 26-10-2023
Partner with Builderscrack
Get work