Exterior of house painted before winter. Treat, clean and water blast surfaces first. Stucco plaster on hardy board exterior. Some repairing to small cracks with flexible crack filler, painting 2 coats to all previously painted surfaces. Exclude roof and access equipment for areas that cannot be reached by mobile scaffold. Walls Textured 226m Soffits 141m Roof Walls 12m Roof Window surround 1 Hardy Flex board 9 Plus Entrance arch columns, Veranda columns (Measurements approximate)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
3.0
|
Communications |
4.0
|
Highly recommend these contractors they did an excellent job that we are pleased with. The weather held us up at times but completed well before the time frame that any other contractor could do the job.
Work carried out by a subcontractor
Reviewed on 04-10-2017
Tradesperson reply
"Thankyou"
Partner with Builderscrack
Get work