Published on 18 November 2024
Need the ceiling of the kitchen dining area re-painted as a few patch jobs now require the paint to cover it all up. Have 2 bedrooms that need updating paint wise. Couple of walls in the bedroom do require some prep due to ripped paper. Bedrooms have large corner windows & built in wardrobes.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job done in really good time as well. No sanding between coats but it has still come up really well. Plastering work that needed to be done pre painting was also done really well.
Work carried out by the owner/operator
Reviewed on 1 January 2025
Partner with Builderscrack
Get work