Active job

Kitchen

Job description

Interior Painting
Porirua

Getting kitchen remodelled. Room is 11.5sqm so small job. Room will be gutted and surfaces gibbed and plastered. Ceiling and some wallspace as well as window, and door surrounds. Timing is week of the 23rd January (dependent on builder being finished). Previous plan for painting has fallen over which is why the short notice.


Trade professionals

#1 Tradie 1
106 jobs No longer in contact
#2 Tradie 2
40 jobs No longer in contact
#3 Tradie 3
1 job No longer in contact
#4 Tradie 4
37 jobs No longer in contact
#5 Tradie 5
56 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo