Prep and paint weatherboard areas and doors as per attached photos. Also stain beams in conservatory area and outside shed paint gutters and barge boards 2 coats Paint supplied Will be professionally house washed prior to painting
#1 | Tradie 1 |
|
35 jobs | No longer in contact |
#2 | Tradie 2 |
|
31 jobs | No longer in contact |
#3 | Tradie 3 |
|
128 jobs | No longer in contact |
#4 | Tradie 4 |
|
1 job | No longer in contact |
#5 | Tradie 5 |
|
15 jobs | No longer in contact |
#6 | Tradie 6 |
|
3 jobs | No longer in contact |
#7 | Tradie 7 |
|
16 jobs | No longer in contact |
Partner with Builderscrack
Get work