We are installing a new kitchen and want the kitchen and lounge repainted including walls, ceilings, and woodwork. There will be some plastering required as we will be replacing some plumbing while we are at it. The area should be ready for start on 10th April, please note that contractor will need to co-operate with the tenant.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 27-04-2022
Tradesperson reply
"Thank you Dale"
Partner with Builderscrack
Get work