Papakura Hi, we have 2 storey new build and a new single garage that will need both interior and exterior painting. Upper level frames to be stood next week, weather permitting, so timeline would be in the next 5-7 weeks. Plans available to quote from.
#1 | Tradie 1 | No recent reviews | 24 jobs | No longer in contact |
#2 | Tradie 2 |
|
69 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 28 jobs | No longer in contact |
#4 | Tradie 4 |
|
54 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 14 jobs | No longer in contact |
#6 | Tradie 6 |
|
26 jobs | No longer in contact |
#7 | Tradie 7 | Not reviewed | 0 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work