Ceiling replaced after header tank leak still needs painting. Gib ceiling already stopped and 1 small area of Pinex. About 16 square meters total. Needs to be completed before 27th April please.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 15-04-2019
Partner with Builderscrack
Get work