This is a two level house. The top level has plaster wall that need to be painted. The house was built in 2001 and the wall has been replastered in 2015. Before painting, all the joints between the wall and windows need to be re-sealed. Soffits of the top level also need to be painted.
#1 | Tradie 1 |
|
34 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
18 jobs | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
#5 | Tradie 5 |
|
32 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
#7 | Tradie 7 |
|
1 job | No longer in contact |
#8 | Tradie 8 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work