Lounge, hallway, stairs and stairwell, upstairs hallway, 3 x bedrooms. Includes ceilings, moldings and maybe windows (negotiable). Wallpaper was stripped from the walls of the lounge, so may need plastering to smooth it out (compound purchased), however, all the walls have been prepped badly before the current painting, just need the best prep work and painting that's affordable. Prefer someone who will use the paint and sealants I have purchased, although will consider other paint if it is needed. Timeline - from 17th July (after the school holidays).
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
12 jobs | No longer in contact |
#3 | Tradie 3 |
|
4 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 |
|
13 jobs | No longer in contact |
Partner with Builderscrack
Get work