3 bedrooms, approximate floor area 100 sqm. Timber weatherboards some prep work required. Timber joinery also requires prep. Split level. Half house at ground level, other half on block basement (due to the slope of the ground) which also needs painting. Roof and spouting do not need painting. Some scaffolding will be required. Easy access to and around house. April-May would be ideal at least before winter or in the spring.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Reviewed on 20-06-2020
Partner with Builderscrack
Get work