Double bedroom, internal corridoor including stairwell have had 90% of the wallpaper removed. We require someone to finish the wallpaper removal, plaster as required and then paint the ceilings, walls and associated frames. Carpet in these areas is only 2 years old so will need to be protected. The bedroom is available to start from next week, with the corridoor about a week after that as we are changing the electrical lights. We are happy to have the entire job done as one piece of work if that is more cost effective. Would like the entire job completed by end of February if possible.
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
#2 | Tradie 2 |
|
56 jobs | No longer in contact |
#3 | Tradie 3 |
|
18 jobs | No longer in contact |
#4 | Tradie 4 |
|
1 job | No longer in contact |
#5 | Tradie 5 |
|
13 jobs | No longer in contact |
#6 | Tradie 6 |
|
47 jobs | No longer in contact |
Partner with Builderscrack
Get work