Hi, I need a roof post and a new deck (3months old) stained including in between the boards. The stain will be provided. I will clean it, water blast and sand the post. The deck is 35m2 plus stairs and horizontal members as shown in the photos. Can be done as soon as the weather allows (at least 3-4 dry days before staining).
#1 | Tradie 1 |
|
9 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work