Review

Linear weather Board House

Job description

Exterior Painting
Far North

Pole house, Will need scaffolding on the two ends (say 7m wide x 6m high - tapering). Will need sanding, primer under coat plus 1 or 2 top coats


Review

Workmanship
4.0
Cost
4.0
Schedule
5.0
Communications
5.0

Great Job thanks Colin and team. A little later starting than originally thought, but that's life. Ended in the duration he thought. Could have gone with cheaper price but ended up very satisfied. Thanks team

Work carried out by an employee of the company
Reviewed on 04-02-2019

Tradesperson reply
"We are very disappointed to have been marked down on workmanship and cost. This was an older house and we quoted our scope of works which was accepted, and we completed this as quoted and as per Master Painters NZ standards. The client has raised no issue re our workmanship. We feel we prepared and painted this job to a high standard and would expect it to be rated accordingly. The client lived in Auckland and the property is in Mangonui, rented. The quoted cost was accepted by the client."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo