Published on 6 January 2025
I have a vacant house for this week only before new tenants move in, so if you've had a job cancel or want to get back into it early there is a couple of days work here of various small jobs, but must be done this week(I'm thinking wed/thurs/fri but could be tomorrow too). Roughly: Repaint a wall (not trims) Repaint a very small (for a deck) covered deck Single coat a hallway (not trims) Paint 4x doors Touch up a couple of square metres of cladding if there's time. Top coat a ceiling If you're available this week let me know your contact number and rates and let's get into it. Cheers
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Cheers Mike. Everything was as expected and Mike is a friendly chap with good communication skills.
Work carried out by the owner/operator
Reviewed on 13 January 2025
Tradesperson reply
"Thanks James!"
Partner with Builderscrack
Get work