Published on 8 January 2024
Done 5 years ago and in with paint coming off on north and west side of house needs to be redone. Most of outside joinery needs to be done and some of inside joinery too. 2 story house with most windows on second floor.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 18 March 2024
Partner with Builderscrack
Get work