Interior painting required in three small downstairs rooms - newly GIBed bathroom, small landing (recently plastered) and bedroom. Small external weatherboard area where a door was removed and replaced with a a window.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 19-04-2023
Partner with Builderscrack
Get work