Description: repaint the two areas depicted in the attached photos. Area 1: Clading below roof on the back and on the left of the House (including the white and drak grey areas). This area is easily accessible from a flat roof. This area is depicted in photo "roof_back_and_left.jpg". I have the formula for the dark grey colour. Area 2: Clading below roof on the front of the house. This area will be at around 4m height. Note the power line (I will organise the disconnection with the power compmay when required). This is shown in photo "roof_front.jpg". Timeframe: Before May 2023
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by an employee of the company
Reviewed on 19-11-2022
Partner with Builderscrack
Get work