Published on 11 November 2024
We're getting some of the windows changed - so need to get some painting down afterwards. Will need to stage across 2 weeks. Stage 1: lounge, dining & kitchen, laundry, hallway, w.c. (not bathroom). Including ceiling. Stage 2: 3 x bedrooms + robes. Including ceiling. And garage. Date would be mid - late Dec. Happy for work to be done across the Xmas hols.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Gabriel was fantastic to deal with. Quick to visit and quote, good price - we had a cheaper price but he made us feel more comfortable with his workmanship and attention to detail so we picked him, and glad we did because he did such a fantastic job. Gabriel worked hard to get the job done faster than he estimated. Very stoked with the job. Well done.
Work carried out by the owner/operator
Reviewed on 12 December 2024
Tradesperson reply
"Thank you Chris for choosing me to do the job. It was a pleasure to do this job for your family and that you were happy with the result, which is what is important. Happy to do some other work for you. Thanks again."
Partner with Builderscrack
Get work