25 slat panels to be removed from 144 High Street and installed at 124 Hight street. Some panels will need to be cut to fit and a few new sheets will need to be installed. Also need the removal of 2 shelves (3 and 4 metres long) and reinstalled at new site. Additional shelving will need to be built.
Partner with Builderscrack
Get work