Move 20ft container from front of section to concrete pad at rear of section placing as far back on pad as possible. Clearance on driveway is limited as shown in pictures. Also need to take care around overhead fibre optic cable. Would recommend viewing to confirm planned method.
#1 | Tradie 1 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work