Published on 8th September 2022
1. The ceilings are to be reclad in Gib starting 17 October and existing lighting is to be replaced with downlights as part of that job. Access to the property is available as of 13 October for early wiring etc.
2. The bathroom is to be renovated and a new hotpoint is to be installed near the vanity.
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Ronald was very easy to work with and flexible around changes to the original task list and installation timeline. I would be happy to recommend RAO Electrical and more than happy to use them again in future."
Work carried out by the owner/operator
Review posted by Ross on 2nd December 2022
"Thank you for the great review I appreciate it."
2nd December 2022
Verified work review
Partner with Builderscrack
Get work