1. A present white plastic heated towel rail needs to be removed (photo attached) and replaced with a 7 rail stainless steel one. 2. Holes remaining after the removal in the white wall tiles and white wall need to be filled. 3. Two ceiling reset lights need to be removed from one switch (photo below) which is to be removed to make way for a wall. Downstairs ceiling of a two storey townhouse. The two lights then need to be rewired to two existing switches. (First Light shown needs to be attached to the switch inside the door shown. Second Light shown needs to be attached to the switch shown on the wall)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Very quick to communicate. Well organised. Only issue was indicating when viewing the job that one light could be connected to a different switch but should have warned that if a number of beams were in the ceiling then holes would be required. Two holes were required in the end.
Work carried out by the owner/operator
Reviewed on 06-08-2023
#1 | Tradie 1 |
|
148 jobs | Secured job |
#2 | Tradie 2 |
|
137 jobs | No longer in contact |
#3 | Tradie 3 |
|
264 jobs | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
#5 | Tradie 5 |
|
161 jobs | No longer in contact |
#6 | Tradie 6 |
|
13 jobs | No longer in contact |
#7 | Tradie 7 | Not reviewed | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work