Posted 9 years ago
Remove existing bark and pebbles 56m2 and excavate approx. 100mm clay/ volcanic soil to replace with grass 30m2 and paved areas 26m2. Possible retaining wall of 0.6m high 12m long and 3m return on corner to be priced separately.
Posted 10 years ago
We have concrete lifted on a mowing strip,some grass to be put down,huge ant problem,tap faucet that has lost the hot water.
Partner with Builderscrack