1. DOC style concrete filled timber steps curving up from lower cement walkway to provide access to upper, currently unconstructed, walkway. Photos from below and above are attached. 2. Timber upper walkway approximately 7.5 metres in length – photo attached. To be completed by mid May 2023 at the latest.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 06-06-2023
Tradesperson reply
"A pleasure to provide an accessible access for such a difficult site."
Partner with Builderscrack
Get work