estimate to pave the existing terrace path using the current tiles. Some ground preparation will also be required. Ground levels will need to be lowered in order to meet the code of compliance obligations. The house is currently being re clad and the paving is obstructed by scaffolding. The scaffolding is likely to be removed late January 2020
#1 | Tradie 1 |
|
85 jobs | No longer in contact |
Partner with Builderscrack
Get work