I have 17 fence panels sitting in concrete feet which are 2.4 long, these need to be removed and replaced with 14 at 3metre long panels. The job requires 2 people to do the work. There is a half days work. The work needs to be done tomorrow --- between the hours of 7.00am and 4.00pm.
#1 | Tradie 1 | No recent reviews | 3 jobs | No longer in contact |
#2 | Tradie 2 |
|
79 jobs | No longer in contact |
Partner with Builderscrack
Get work