We would like: the retaining wall moved back to the first level( we will move the rocks over). Dig out the mud and flatten to cover with grass. Front fence to be removed and will be concrete block and slatted fence.
#1 | Tradie 1 |
|
37 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 32 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 12 jobs | No longer in contact |
#4 | Tradie 4 |
|
5 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work