Dig out and remove soil and some metal and lay concrete alongside timber edging and timber retaining posts 14 metres .
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 21-07-2023
Tradesperson reply
"Thanks. The job came up looking awesome for your new tenants.👍😁"
Partner with Builderscrack
Get work