Stoned driveway installed for building now requires edging to define edges. Presumably shallow trench with timber and peg. Approx. 205M straight and curved. Timeframe ASAP, preferably before Christmas Hols.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very professional approach to the contract and work of the highest order. Pleased with all aspects of the job and happy to recommend.
Work carried out by the owner/operator
Reviewed on 29-11-2022
Tradesperson reply
"Thank you for the great review Robert. Was a pleasure to assist with landscaping."
Partner with Builderscrack
Get work