Dig out current weed, stone situation and remove . Reposition current edging to line indicated. prepare base and install Jakmat and appropriate base aggregates to Jakmat installation instructions. Fill with Waikato fleck riverstones Install pillar letterbox (to be supplied)to left. Ideally soon but I’ve been waiting for my husband to get round to it and sick of waiting 😊
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 |
|
7 jobs | No longer in contact |
#4 | Tradie 4 |
|
3 jobs | No longer in contact |
#5 | Tradie 5 |
|
52 jobs | No longer in contact |
Partner with Builderscrack
Get work