reduce the back section slope to almost level using a excavator and relocating dirt to front section. And cascading back section with a 1m high retaining wall at the rear approximately 17 meters long, and a second 1m high retaining wall approximately 12 meters long.
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work