The job is for a digger and driver to level out ground for the installation of an above ground portable pool. The area is about 3.5 x 8m. Soil will remain site, and will be leveled out. And if possible, drill 4 fence post holes - not essential
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job, excellent workmanship, good advice on other aspects of the project. Polite, friendly, easy to work with and got the job done in really good time!
Work carried out by the owner/operator
Reviewed on 28-11-2023
Partner with Builderscrack
Get work