Our back lawn is very water logged, muddy under foot, and takes days to dry out after rain has gone. Its roughly a 12meter by 12 meter area that needs attention. Happy for any suggestions on how best to fix the issue.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Awesome job, thanks heaps Jon. Alot of had yakka moving all the aggregate, by wheelbarrow , to the back yard. But it was done on time and to a high standard.
Work carried out by the owner/operator
Reviewed on 14-07-2023
Partner with Builderscrack
Get work